|
Case study - Energy Optimization using Parallel Mixed
Integer Programming at Veba Oel
Problem
In the Oil & Natural Gas industry it is very profitable to optimize
the flow of raw materials and finished goods into and out of refineries.
In large energy companies, this type of transportation modeling
and optimization problem can become very large and extremely complex.
Solution
Veba Oel, a large oil & gas exploration and production company based
in Germany, solved this problem using Haverly's GRTMPS forward planning
system which was enhanced with Dash Optimization's Xpress-MP Parallel
MIP solver. This modification has enabled Veba Oel to drastically
reduce the optimization computation time for their model.
Model Specifics and Benefits
The transportation model that Veba Oel optimizes is the flow of
materials through their refineries into the distribution network.
This includes the flow of raw materials from the market into the
refineries, and then back into the market as finished goods. Also
factored into this model are raw materials and finished goods prices,
along with the impact of different refinery processes and the changes
in the stream properties as they occur.
Veba Oel's biggest transportation model is a matrix
that has 16,000 rows, 28,000 columns, 140,000 non-zero elements
with 1,300 integer variables. Previously the problem took over 12
hours to solve. In order to cut down this run-time, Veba Oel uses
'hooks' within the GRTMPS software to call the Xpress-MP MIP Parallel
Solver. The Parallel Solver distributes the optimization process
onto multiple processors, attaining a run-time of 1 hour 16 minutes
with an accuracy of 0.01%.
Hardware and Software specifics
Veba Oel uses the GRTMPS system based on Dash Optimization's Parallel
Xpress-MP version 12.15. This runs on a PC with 2GB memory and two
540 MHz-processors.
About Veba Oel
Veba Oel has refining and marketing operations across Europe, along
with exploration and production sites in 13 different countries,
primarily in the North Sea and Latin America. Currently, Veba Oel
has reserves of over 600 million barrels of oil and 314 billion
cubic feet of natural gas.
About Haverly
Haverly Systems, Inc., has offices in New Jersey, California, Texas,
and England. Haverly has provided process industries with decision
support systems since 1962. In June of 2001, Haverly finished out
its 39th Consecutive Profitable Year.
|